Coming soon to Android, then iPhone

The cutest way to get stronger.

RepBunny is a workout log that's quick between sets, knows your gym's machines, and throws you a little party when you hit a new best. No account. No ads. No guilt.

Download on theApp Store Get it onGoogle Play See what's inside
  • Free to download
  • Logging is free forever
  • No subscription

Made for your gym

Machines, dumbbells, cardio. All in one place.

Most lifting apps assume a barbell and a spreadsheet brain. RepBunny logs the way your gym actually works.

Private by design

Your workouts stay on your phone.

No account to make, no ads, no tracking. We can't see your weights, your body measurements, or anything else you log.

  • No accountNo sign-up, no email, no password
  • No adsNo trackers, nothing sold
  • Yours to keepBack up or export anytime

New to lifting?

You don't need a plan. Grab one.

Pick a starter program like Beginner full body, three days a week, and it shows up as routines you can change any way you like. Next time, RepBunny shows what you did last time and what to try today, with the reasoning right there. Take the hint or ignore it.

  • Full body, upper/lower, or push/pull/legs
  • Your last set, ready to repeat in one tap
  • A rest timer with a bunny who waits with you
Routines screen with Leg, Pull, and Push days, and starter programs: Beginner full body, Upper / lower, and Push / pull / legs

Wins that feel like wins

Beat your best. Get confetti.

When you lift more than ever before, RepBunny makes a little moment of it, with the numbers to prove it. Try it.

Leg press Set 3 of 3
3 180 lb 10 reps

Last time: 10 × 170 lb. Tap the check.

No streaks. No guilt.

Missed a week? Nothing resets.

Life happens. RepBunny's milestones only add up, so a busy week never costs you anything. With Premium, showing up unlocks new week marks, confetti, sounds, and bunny personalities. On the free plan, milestones earn you trial passes to try Premium.

Make it yours

Pick a look. Dress the bunny.

Plenty of themes to choose from, each with a matching app icon, plus new ones for the big holidays. Go full pink, get spooky for Halloween, or switch to Chalk if you'd rather keep it low-key. Tap one to see it.

Take a peek

Everything you need. Nothing you don't.

Our promise

Logging is free. Always.

Every workout, set, and rep stays free, with no limits and no trial timer. Premium is a one-time unlock for the extras. No subscription.

Free

Everything you need to train

  • Unlimited workouts and history
  • Weights, machines, bodyweight, assisted, and cardio
  • Rest timer
  • 3 saved routines, or a starter program to fill them
  • Records, milestones, and how-it-felt tags
  • Back up and export your data anytime
Pay once

Premium

Extra tools around your log

  • Unlimited routines
  • Swap suggestions when a machine is taken
  • Est. 1RM, volume, and all-time lift charts
  • Next-set targets and strength levels
  • Monthly reports, a year recap, and a PDF for your trainer
  • Body measurements with a chart for each
  • Rest timer on your lock screen, and home screen widgets
  • Themes, matching app icons, and the plate calculator
  • Extras you earn by training: sounds, confetti, week marks, and more

Who's behind RepBunny

It started as a gift.

Dean giving Christa a piggyback ride on a leafy autumn trail, both smiling.
Piggyback rides count as cardio.

Christa Bunn Bunn

Christa is the bunny the app is named after. I wanted her to have a way to track her gym progress without paying for an app, and I wanted it to be really cute. Now she lifts with me, tests every build, weighs in on the design, and keeps me honest at the gym.

Dean Deanie Bear

Years of bad habits started catching up with me, so I decided to take my health and fitness more seriously. I've lost over 90 lb so far, and I'm still going. I build RepBunny and log every workout in it.

Why it's an app now. While I was building it, I noticed most workout apps felt like spreadsheets or were made for guys. So the gift turned into an app for anyone who's new to lifting and wants their progress to feel like a win.

Let's hop in.

Small wins. Stronger every set. Coming soon to Android, then iPhone.

Download on theApp Store Get it onGoogle Play

Want to try it early on Android? Email [email protected] with the address of the Google account on your phone, and we'll add you as a tester. Testers get Premium free.